dc.description.abstractIn the successful maintenance of electricity generation management processes in power generation plants, it is of great importance to determine the risks that may arise during the operation of the relevant processes, take measures to minimize these risks, and take the necessary actions. In this study, common risks in the electricity generation management process in HEPPs were identified and these risks were rated by experts (decision-makers) within each power plant itself. Since this rating is made by the experts of each power plant, the impact and probability values of the same risk may differ, and accordingly, different risk levels may arise for the same risk. In the study, the SWARA method was used to compare the risk levels of common risks in the electricity generation process in different power plants and calculate the final weight values of the related risks. As a result of the measures determined for each risk in the electricity generation management processes in the power plants and the actions taken for these measures, it was determined whether the relevant risks were reduced to acceptable levels by looking at the results of the internal audits. In the internal audits, the performance of HEPPs in eliminating the related risks is evaluated with fuzzy expressions separately for each risk. The risk weight values obtained by the SWARA method and the fuzzy expressions obtained as a result of the risk assessment were analyzed with the Fuzzy TOPSIS method, and the performance values of the power plants in eliminating the risks were calculated, then the performance ranking was made in the light of these values.en_US
dc.identifier.doi10.2339/politeknik.917535
dc.identifier.issn1302-0900
dc.identifier.issn2147-9429
dc.identifier.trdizinid1227707en_US
dc.identifier.urihttps://doi.org/10.2339/politeknik.917535
dc.identifier.urihttps://hdl.handle.net/20.500.12684/13040
dc.identifier.wosWOS:000831295100001en_US
dc.identifier.wosqualityN/Aen_US
dc.indekslendigikaynakWeb of Scienceen_US
dc.institutionauthorYücedağ, İbrahim
dc.language.isoenen_US
dc.publisherGazi Univen_US
dc.relation.ispartofJournal of Polytechnic-Politeknik Dergisien_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.snmz$2023V1Guncelleme$en_US
dc.subjectSwara; Fuzzy Topsis; Electricity Generation Management Process; Risk Analysisen_US
dc.subjectSafety Risk; Vikor; Fmeaen_US
dc.titleRisk Assessment for Electricity Generation Management Process with SWARA Based Fuzzy TOPSIS Methoden_US
dc.typeArticleen_US

Dosyalar

Orijinal paket
Listeleniyor 1 - 1 / 1
Yükleniyor...
Küçük Resim
İsim:
13040.pdf
Boyut:
1.05 MB
Biçim:
Adobe Portable Document Format
Açıklama:
Tam Metin / Full Text