CONTROLLING THE COST OF RISK MANAGEMENT BY UTILISING A PHASE PORTRAIT METHODOLOGY
Yükleniyor...
Dosyalar
Tarih
2018
Dergi Başlığı
Dergi ISSN
Cilt Başlığı
Yayıncı
Vilnius Gediminas Tech Univ
Erişim Hakkı
info:eu-repo/semantics/openAccess
Özet
The methodology developed in this study presents an approach to the concurrent evaluation of Risk Management (RM) effectiveness during project execution. The method proposed is an adaptation of an approach developed and advocated by Khlebopros et al. (2007) for the mathematical modelling of complex systems, namely the analysis and effects of natural catastrophes. Hence, the method utilizes a phase portrait approach to identify the Prime Cost (PC) of RM of a project. Furthermore, the method provides an approach for comparing the individual identified risks with this PC, and subsequently highlighting a way of classifying and prioritising risks into a rank order for RM attention. The MERA (Multiple Estimating Risk Analysis) approach was utilized for the quantification of risk impact and ultimately the creation of the phase portrait. Besides being accurate and intuitively understandable, the methodology is relatively simple to implement and provides a rapid visualisation of the overall risk extent of a project.
Açıklama
WOS: 000428175400002
Anahtar Kelimeler
risk analysis, risk management, risk monitoring, project management, construction industry, cost control, phase portraits
Kaynak
Transport
WoS Q Değeri
Q3
Scopus Q Değeri
Q2
Cilt
33
Sayı
2