Yıldız, AliYıldırız, Emin2025-03-242025-03-2420191309-5501https://hdl.handle.net/20.500.12684/19508In this study, taking into consideration the requirements of Düzce province, a cost-benefit analysis of a 15 kWp alternative submersible pump to be installed for water supply via grid connected a Solar Power Plant (GES) was done. Therefore, firstly, radiation values of Düzce have been determined by considering four different databases. When calculating the refund period of the projected system considering the water requirement after 30 years, the future energy production must be estimated accurately. For this purpose, PVsyst program which has an important place in literature and curve fitting method as a statistical method was used. These data were examined by taking into account the existing GES data and the average of these three data were processed.Bu çalışmada Düzce ili gereksinimleri dikkate alınarak su temini amaçlı kurulacak 15 kWp gücünde bir alternatif akım dalgıç pompasının şebeke bağlantılı bir Güneş Enerji Santrali (GES) üzerinden beslenmesinin fayda-maliyet analizi yapılmıştır. Bunun için ilk olarak Düzce’nin radyasyon değerleri dört farklı veri tabanı dikkate alınarak belirlenmiştir. 30 yıl sonraki su ihtiyacı dikkate alınarak projelendirilen sistemin geri ödeme süresi hesaplanırken, gelecekteki enerji üretiminin doğru tahmin edilmesi gerekir. Bunun için literatürde de kendine yer bulmuş PVsyst programı ve istatistiksel bir yöntem olarak da eğri uydurma yöntemi kullanılmıştır. Bu veriler mevcut GES verileri de dikkate alınarak incelenmiş ve bu üç verinin ortalaması işleme alınmıştır. trinfo:eu-repo/semantics/openAccessPhotovoltaic|Regression analysis|Cost-Benefit|Fotovoltaik|Regresyon analizi|fayda-maliyetCost-Benefit Analysis On-Grid 15 kWp Power Photovoltaic System For Water Supply Applicatıon in The Villages Of DüzceDüzce Çevresinde Su Temin Uygulaması İçin Şebeke Bağlantılı 15 kWp Güçteki PV Sistemin Fayda-Maliyet AnaliziArticle923341