Uğur, Latif Onur2020-04-302020-04-3020171302-09002147-9429https://doi.org/10.2339/politeknik.339408https://hdl.handle.net/20.500.12684/3228WOS: 000447837400027Large investment costs, detailed quality requirements and limited construction periods of forming a continuous stress requires; in the planning details, being organized and methodical checks of construction projects. In today's economic conditions, finding project managers which have required quality for the construction projects which incurred with low profits, is a subject itself. In this study, selection of a project manager who will work in big construction project in a foreign country (Russia) aimed. The selection proses made with a multi-criteria approach method, MOORE decision-making process. Ratio Analysis and Reference Point based calculations made and obtained sequences compared. Such a decision model based on the MOORA method, sides may be used for election and evaluation of project managers in construction companies. Application of the model, can be use in similar construction companies by changing the criterias.tr10.2339/politeknik.339408info:eu-repo/semantics/closedAccessConstruction project manegermanager selectionmulti-objective optimizationMOORA methodConstruction Project Maneger Selection With the MOORA Optimisation Method: A Multi-Objective Optimization ApplicationArticle203717723N/A